- Done
- In progress
Manufacturing plan From material to goods
The pain is paper work orders and costing at month-end. Materials leave the shelf, finished goods come back, and cost comes from that use.
5,000,000 Toman / month
- Room to growas the company needs
- Fast accessto the records
- One placefor the work
- Done
- In progress
Every tool, in one place
For a plant whose work orders sit on paper and whose costing waits for month-end.
What is in this product
- A work order from sales or a plan
- Material use from the same stock
- Finished goods on the same shelf
- Costing from that consumption
- Several steps and lines
- Scrap on the same order
- Hosting and backup
- A production-lead role
How it works
Built from a sales order or a plan. Needed materials reserve there.
Materials leave the line warehouse. Stock and value update at once.
Finished goods enter product stock. Sales sees that lot.
Material and labor stay on that order. A side report is not built.
Questions
Daily work for that unit, plus hosting, updates and backup. The three blocks below cover what you get, a working day, and the feature list.
Yes. Each unit has its own plan. Buy another later from that unit’s page. If you want several together, look at the custom pack.
The card shows one month. Three months is that sum minus 5%, six months minus 10%, twelve months minus 15%.
No. Hosting, updates and backup are inside Manufacturing plan.
The pain of that job living apart: sales in chat, stock in a sheet, finance at month-end. The page below names that pain and the working day.
You pay on this site. We switch the plan on in the cloud and arrange access with your team. Nothing is shipped.
Everything in your hands
A clear workspace for the work you already do.